01
Ensuite & cloakroom conversions
The most common brief we take: a downstairs toilet that should be a shower room, a box bedroom that should be an ensuite, or a landing cupboard that can take a compact wet room. The work is as much about waste, water pressure and extraction as it is about tiles.
- Soil-stack and waste runs planned before anything comes out
- Tanking, boarded showers and correctly specified extraction
- Underfloor heating where the floor build-up allows
- Joinery for vanity, linen and hidden cisterns
- Typical programme: 2–4 weeks for a cloakroom conversion; 3–6 for a full ensuite